Skip to content
    SQ Tech

    Case study · Industrial

    Mainland Headwear plant, Agua Prieta: 181,000 sq ft (16,805 m²) and 437 metric tons of steel

    SQ Tech built Mainland Headwear's manufacturing plant in Agua Prieta, Sonora, a border town across from Douglas, Arizona, as a turnkey built-to-suit project. It produced the design documents and managed the whole job, did the civil work for the foundations, and fabricated and erected the steel structure and the metal roof: 181,000 sq ft (16,805 m²) and 437 metric tons of steel.

    This page documents the construction of the plant. SQ Tech does not recruit staff for Mainland Headwear.

    Mainland Headwear plant, 181,000 sq ft, Agua Prieta: finished building with parking
    Finished · Finished plant: entrance, parking and gatehouse.

    Challenge

    The brief was to deliver a building ready to operate with a single party responsible, from design documents to handover. In a traditional setup, design, foundations, structure and roof sit in separate contracts, and every boundary between contractors is a place where time and accountability get lost.

    The 181,000 sq ft manufacturing building is in Sonora's border strip; the structure was fabricated in SQ Tech's shop in Hermosillo and hauled to Agua Prieta for erection on site.

    Solution

    SQ Tech worked design-build with overall management of the job: it produced the design documents, did the civil work for the foundations, fabricated the steel structure of the manufacturing building, erected it and installed the metal roof.

    With one contractor, the structural design is done with fabrication and erection in mind, the foundation is built from the same engineering that sizes the structure, and field adjustments are solved within the same team. The client deals with one party instead of coordinating several.

    The building uses 437 metric tons of steel for 181,000 sq ft: 26.0 kg per m² (5.3 lb/sq ft), a lighter structure per square foot than the Carlisle (35.5 kg/m²) and Stanley Black & Decker (34.4 kg/m²) plants in Nogales.

    The photos show the finished plant on an open lot in Agua Prieta: the manufacturing building, the paved yard, the parking lot and the gatehouse.

    Structural system

    • Manufacturing building in structural steel
    • Metal roof
    • Foundations (civil work) by SQ Tech
    • Design documents and overall management of the job
    Aerial view of the Mainland Headwear plant in Agua Prieta, Sonora
    Finished · Aerial view of the plant in Agua Prieta.

    Quote a similar project

    Tell us what you need to build, where and when. We reply within 24 business hours. Hermosillo keeps Arizona time (MST, UTC−7, no daylight saving).

    required

    Your project

    e.g. 50 × 100 ft, 16 ft eave

    Your details

    10 digits

    Use, size, eave height, doors, target date…

    PDF, DWG, DXF, RVT, JPG, PNG or ZIP, up to 20 MB.

    For files over 20 MB, or if you prefer to share them that way.

    We reply within 24 business hours.

    By sending, you accept our privacy notice (in Spanish).